Category
JK Projects
Water Supply & Distribution

Water supply projects, intended to supply drinking water, are executed on turnkey basis, right from working survey, to supply of wholesome and potable water to the target population. Presently we are implementing two such projects for Govt. of Gujarat, capable of supplying daily requirement of 50 lac ltr. & 70 lac ltr. respectively. In the past aggregate of completed projects volume is 750 lac ltr. Currently Borsad Degadia Part-II Regional Water Supply Scheme for 18 villages is under progress in Surat district of Gujarat state.

Ongoing Projects
  • Bridge across River
    PWD- Uttarakhand, highly specialized steel girder bridge of 95 mtr single spam, resting on only two abutments. The bridge is to be constructed across a paranial river in hilly areas of Nainital district in Uttarakhand state.
  • Intake structure at river Tapi
    Gujarat Industries Power Corporation Ltd, Surat Lignite Power Project, an Intake well of 200 MLD capacity, 12 mtr dia is under construction at Nani Naroli of Surat district, Gujarat ,the project includes construction of pump house and 3 x 24 mtr spam RCC bridge to carry 2 x 900 mm side rising main pipeline.
  • Tenakhadi Bridge
    Gujarat Water Supply & Sewage Board, The Bridge is on cast-insitu pile foundation having 12 mtr x 17 span steel girder type super structure.
  • Kareli Regional Water Supply Project
    A turnkey water supply project to provide treated and wholesome drinking water for 22 villages of olpad taluka in coastal and highly saline areas of Surat district. The work comprises of construction of clear water sump, RCC ESR’s up to 5 lac liter capacity distribution pipeline network of about 80 Km length and allied work.
Share with friends
all rights reserved with jk projects pvt. ltd. © 2011 Designed by: mediatricks